Painting and varnishing work - coatings for the expansion of forensics at BKH Schloss Werneck.
A new extension with approx. 3,011 m2 NF according to DIN 13080 with 2 wards for 24 patients each, of which 1 half-ward as
highly secured area.
Note: There is an interruption in performance due to construction cycle execution.
As a result of the execution of the construction cycles, an interruption of performance with a total duration of at least approx. 9 months can be assumed. The exact dates for construction cycle 3 will be submitted in about 30 working days.
Construction cycle 2 - West Wing Start of construction: approx. 18.09.2023-05.04.2024
Construction phase 3 - Security center and administration Start of construction: approx. 08.01.2025-26.04.2025 (will be submitted later)
Bautakt 2 - west wing
Preparatory work
Masking and masking measures 400,000 m2
Filling work
Note
Full putty concrete walls 2300,000 m2
Full filling concrete columns, cross-sectional area 0.01-0.10 m2 7,000 m
Full filling concrete columns, cross-sectional area 0.11 - 0.20 m2 26,000 m
Full filler concrete beams, cross-sectional area 0.01-0.10 m2 157,000 m
Full filling concrete beams, cross-sectional area 0.11-0.20 m2 81,000 m
Full filling concrete beams, cross-sectional area 0.21 - 0.50 m2 51,000 m
Full filler concrete ceilings 1115,000 m2
Eckschienen 105,000 m
Allowance walls 450,000 m2
Filler work stairwell
Full putty concrete walls 450,000 m2
Vollspachtelung Treppenuntersichten 90,000 m2
Vollspachtelung Podestuntersichten 105,000 m2
Vollspachtelung Treppenwange 65,000 m
Vollspachtelung Treppenhausdecke 55,000 m2
Allowance stairwell walls 350,000 m2
Allowance stairwell ceiling 55,000 m2
Painting of troweled surfaces
Painting beams 289,000 m2
Painting ceilings 1115,000 m2
Painting columns 33,000 m2
Painting walls 2300,000 m2
Allowance walls 450,000 m2
Painting plastered surfaces
Painting on plastered surfaces 7650,000 m2
Painting reveals 425,000 m
Painting staircase
Painting concrete walls 450,000 m2
Painting stair soffits 90,000 m2
Painting platform soffits 105,000 m2
Painting stairwell ceiling 55,000 m2
Allowance stairwell walls 350,000 m2
Allowance stairwell ceiling 55,000 m2
Painting locksmith components
Stair railing H approx. 1000mm, inside 87,000 m
Stair railing primer 87,000 m
Stahlwange 87,000 m
Steel cheek primer 87,000 m
Steel stairs SDV 4,000 m
Stairs SDV primer 4,000 m
Steel bracket and plates L = up to approx. 22mm 33,000 m
Steel bracket and slabs primer 33,000 m
Railing steel, H approx. 387 mm, outside 5,000 m
Railing steel, H approx. 387 mm Primer 5,000 m
Railing steel, H approx. 455 mm, outside 43,000 m
Railing steel, H approx. 455 mm, primer 43,000 m
Railing steel, H 1000 mm, outside 52,000 m
Railing steel, H approx. 1000 mm Primer 52,000 m
Painting frames and doors
Painting perimeter frame steel door leaf, internal width 150-175 21,000 m
Painting of enclosing frame steel door leaf, internal width 200 183,000 m
Painting perimeter frame steel door leaf, internal width 240-250 42,000 m
Painting steel door leaf indoors 139,000 m2
Others
Grinding + deburring of formwork joints 50,000 m
Grouting up to 10 mm 50,000 m
Grouting up to 15 mm 50,000 m
Additional finishing coat walls 100,000 m2
Additional finishing coat ceilings 100,000 m2
Repair of sheet steel doors 50,000 m2
Frame repair 50,000 m
Repair filler stair soffits, landings, stringer 50,000 m2
Repair putty concrete walls 60,000 m2
Construction phase 3 - Security headquarters and administration
Preparatory work
Covering and masking measures 100,000 m2
Full filling concrete walls 827,000 m2
Full filling concrete columns, cross-sectional area 0.01-0.10 m2 25,000 m
Full filling concrete columns, cross-sectional area 0.11-0.15 m2 6,000 m
Full filling concrete beams, cross-sectional area 0.01-0.10 m2 20,000 m
Vollspachtelung Betonunterzüge, Qeurschnittsfläche 0,11-0,25 m2 70,000 m
Full filler concrete ceilings 12,000 m2
Eckschienen 50,000 m
Painting of troweled surfaces
Painting beams 90,000 m
Painting ceilings 12,000 m2
Painting columns 31,000 m
Painting walls 827,000 m2
Painting plastered surfaces
Painting on plastered surfaces 1300,000 m2
Painting reveals 26,000 m
Painting frames and doors
Painting block frame steel door leaf 4,660 m
Painting steel door leaf, inside 2,690 m2
Others
Grinding + deburring of formwork joints 50,000 m
Grouting up to 10 mm 30,000 m
Grouting up to 15 mm 30,000 m
Additional finishing coat of walls 60,000 m2
Additional finishing coat ceilings 60,000 m2
Repair of sheet steel doors 20,000 m2
Repair of frames 30,000 m