Painting work | Tenderlake

Painting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 June 2023
Closing Date:
10 July 2023
Location(s):
DE26B Schweinfurt, Landkreis (DE Germany/DEUTSCHLAND)
Description:
VE 3.24 Painting and varnishing - Coatings

Painting and varnishing work - coatings for the expansion of forensics at BKH Schloss Werneck.

A new extension with approx. 3,011 m2 NF according to DIN 13080 with 2 wards for 24 patients each, of which 1 half-ward as

highly secured area.

Note: There is an interruption in performance due to construction cycle execution.

As a result of the execution of the construction cycles, an interruption of performance with a total duration of at least approx. 9 months can be assumed. The exact dates for construction cycle 3 will be submitted in about 30 working days.

Construction cycle 2 - West Wing Start of construction: approx. 18.09.2023-05.04.2024

Construction phase 3 - Security center and administration Start of construction: approx. 08.01.2025-26.04.2025 (will be submitted later)

Bautakt 2 - west wing

Preparatory work

Masking and masking measures 400,000 m2

Filling work

Note

Full putty concrete walls 2300,000 m2

Full filling concrete columns, cross-sectional area 0.01-0.10 m2 7,000 m

Full filling concrete columns, cross-sectional area 0.11 - 0.20 m2 26,000 m

Full filler concrete beams, cross-sectional area 0.01-0.10 m2 157,000 m

Full filling concrete beams, cross-sectional area 0.11-0.20 m2 81,000 m

Full filling concrete beams, cross-sectional area 0.21 - 0.50 m2 51,000 m

Full filler concrete ceilings 1115,000 m2

Eckschienen 105,000 m

Allowance walls 450,000 m2

Filler work stairwell

Full putty concrete walls 450,000 m2

Vollspachtelung Treppenuntersichten 90,000 m2

Vollspachtelung Podestuntersichten 105,000 m2

Vollspachtelung Treppenwange 65,000 m

Vollspachtelung Treppenhausdecke 55,000 m2

Allowance stairwell walls 350,000 m2

Allowance stairwell ceiling 55,000 m2

Painting of troweled surfaces

Painting beams 289,000 m2

Painting ceilings 1115,000 m2

Painting columns 33,000 m2

Painting walls 2300,000 m2

Allowance walls 450,000 m2

Painting plastered surfaces

Painting on plastered surfaces 7650,000 m2

Painting reveals 425,000 m

Painting staircase

Painting concrete walls 450,000 m2

Painting stair soffits 90,000 m2

Painting platform soffits 105,000 m2

Painting stairwell ceiling 55,000 m2

Allowance stairwell walls 350,000 m2

Allowance stairwell ceiling 55,000 m2

Painting locksmith components

Stair railing H approx. 1000mm, inside 87,000 m

Stair railing primer 87,000 m

Stahlwange 87,000 m

Steel cheek primer 87,000 m

Steel stairs SDV 4,000 m

Stairs SDV primer 4,000 m

Steel bracket and plates L = up to approx. 22mm 33,000 m

Steel bracket and slabs primer 33,000 m

Railing steel, H approx. 387 mm, outside 5,000 m

Railing steel, H approx. 387 mm Primer 5,000 m

Railing steel, H approx. 455 mm, outside 43,000 m

Railing steel, H approx. 455 mm, primer 43,000 m

Railing steel, H 1000 mm, outside 52,000 m

Railing steel, H approx. 1000 mm Primer 52,000 m

Painting frames and doors

Painting perimeter frame steel door leaf, internal width 150-175 21,000 m

Painting of enclosing frame steel door leaf, internal width 200 183,000 m

Painting perimeter frame steel door leaf, internal width 240-250 42,000 m

Painting steel door leaf indoors 139,000 m2

Others

Grinding + deburring of formwork joints 50,000 m

Grouting up to 10 mm 50,000 m

Grouting up to 15 mm 50,000 m

Additional finishing coat walls 100,000 m2

Additional finishing coat ceilings 100,000 m2

Repair of sheet steel doors 50,000 m2

Frame repair 50,000 m

Repair filler stair soffits, landings, stringer 50,000 m2

Repair putty concrete walls 60,000 m2

Construction phase 3 - Security headquarters and administration

Preparatory work

Covering and masking measures 100,000 m2

Full filling concrete walls 827,000 m2

Full filling concrete columns, cross-sectional area 0.01-0.10 m2 25,000 m

Full filling concrete columns, cross-sectional area 0.11-0.15 m2 6,000 m

Full filling concrete beams, cross-sectional area 0.01-0.10 m2 20,000 m

Vollspachtelung Betonunterzüge, Qeurschnittsfläche 0,11-0,25 m2 70,000 m

Full filler concrete ceilings 12,000 m2

Eckschienen 50,000 m

Painting of troweled surfaces

Painting beams 90,000 m

Painting ceilings 12,000 m2

Painting columns 31,000 m

Painting walls 827,000 m2

Painting plastered surfaces

Painting on plastered surfaces 1300,000 m2

Painting reveals 26,000 m

Painting frames and doors

Painting block frame steel door leaf 4,660 m

Painting steel door leaf, inside 2,690 m2

Others

Grinding + deburring of formwork joints 50,000 m

Grouting up to 10 mm 30,000 m

Grouting up to 15 mm 30,000 m

Additional finishing coat of walls 60,000 m2

Additional finishing coat ceilings 60,000 m2

Repair of sheet steel doors 20,000 m2

Repair of frames 30,000 m

Download full details as .pdf
The Buyer:
Bezirk Unterfranken - Baureferat
CPV Code(s):
45442100 - Painting work
45442110 - Painting work of buildings