A 10, km 120.748-127.506 RH including BW 61, 63, 64, 65 both RF, lot 2 road and bridge construction.
Partial performance 1 road construction:
Psch building / dismantling traffic safety:
- Set up / dismantle approx. 11 370 m transportable protective device;
- Implement approx. 5 340 m of portable protective equipment;
- Create approx. 14,000 m of construction mark;
- clear approx. 3,000 m of shrubbery;
- approx. 3,000 m
- approx. 12,000 m
- approx. 36 400 m
- approx. 2,000 m
- approx. 32 400 m
- approx. 34 400 m
- approx. 34 400 m
- Install approx. 40 h drain;
- renew approx. 400 m drain pipe DN 150-400, including shafts;
- mine approx. 10,000 m SE from steel including AEK and ÜK / ÜE;
- Set up approx. 10,000 m SE made of steel including ÜE / ÜK and AEK;
- Dismantle / set up approx. 100 st guide posts;
- Install approx. 7,000 pieces of grass stop plate;
- about 12,000 m demarcation;
- Make approx. 12,000 m of foil marking.
Partial performance 2-4 BW 61, 63, 64:
- about 2 232 m
- approx. 2 750 m
- approx. 36 t ram carrier HEB;
- approx. 140 m
- approx. 380 m
- approx. 600 m
- approx. 2370 m
- create approx. 910 m joints;
- make approx. 140 m asphalt wedge;
- create approx. 21 m embankment stairs;
- approx. 120 m
- approx. 132 m
- Create approx. 6 pieces of scaffolding;
- approx. 195 m
- approx. 1 370 m
- Install approx. 2 264 compound anchors;
- Install approx. 205 m steel railings;
- approx. 750 m
- Install approx. 750 m reinforcement strips;
- approx. 150 m
- approx. 182 m
- create approx. 36 m of structural joints;
- create approx. 16 m joint cover;
- approx. 900 m
- approx. 6 hours demolition of superstructures;
- approx. 1 770 m
- Expand approx. 24 h street gullies;
- Remove approx. 150 m drainage pipe.
Partial performance 5 BW 65:
- approx. 360 m
- approx. 850 m
- approx. 790 m
- approx. 780 m
- approx. 360 m
- approx. 310 m
- approx. 1 100 m
- approx. 26 m embankment stairs;
- approx. 16 finished parts for superstructure;
- approx. 220 m
- approx. 82 t reinforcing steel for superstructure;
- approx. 124 m
- approx. 25 t reinforced concrete for substructures;
- approx. 64 m
- approx. 25 t reinforcing steel for caps;
- approx. 88 m railings;
- approx. 400 m
Partial performance 6 road construction:
Psch building / dismantling traffic safety:
- Set up / dismantle approx. 9,700 m of portable protective equipment;
- Implement approx. 600 m of portable protective equipment;
- create approx. 8,000 m of construction mark;
- clear approx. 2 900 m of shrubbery;
- approx. 1 200 m
- approx. 10 500 m
- approx. 34,900 m
- approx. 32 550 m
- approx. 31,900 m
- approx. 34,500 m
- Pick up about 1 100 m shelves and set them again;
- Install approx. 27 hours drain;
- renew approx. 820 m drain pipe DN 150-400, including shafts;
- recreate approx. 1 psch induction loop field;
- dismantle approx. 7 300 m SE from steel including AEK and ÜK / ÜE;
- Set up approx. 14 500 m SE made of steel including ÜE / ÜK and AEK;
- set up approx. 145 m SE of concrete;
- Dismantle / set up approx. 100 st guide posts;
- Install approx. 5 300 pieces of grass stop plate;
- about 11,000 m demarcation;
- Make approx. 10 200 m of foil marking;
- produce approx. 800 m agglomerate marking;
- Establish approx. 800 m traffic clearance marking (color).