The contract will include construction works consisting in:
a) Wet tank - bottom, total volume 6,565 m
- reconstruction of the drainage ditch (strengthening of the ditch),
- reconstruction of the drainage ditch from the storm overflow (strengthening of the ditch),
- reconstruction of the frontal causeway (debarking of an existing causeway along with the embankment's density to appropriate parameters),
- reconstruction of the trigger monk in the frontal causeway of the tank (by dismantling the existing one and making a new adapted to the parameters of the rebuilt frontal causeway),
- the canopy and bottom of the tank will be desilted,
- wetland - the refugium will be sorted out of fallen trees and branches.
b) Dry tank - upper, total volume 2,578 m
- reconstruction of the frontal causeway,
- making a storm overflow in the form of a reinforced trapezoidal trough,
- arranging the tank bowl from scrap trees and branches (no other works will be carried out).
Wet tank - bottom, total volume 6,565 m
- reconstruction of the drainage ditch (strengthening of the ditch),
- reconstruction of the drainage ditch from the storm overflow (strengthening of the ditch),
- reconstruction of the frontal causeway (debarking of an existing causeway along with the embankment's density to appropriate parameters),
- reconstruction of the trigger monk in the frontal causeway of the tank (by dismantling the existing one and making a new adapted to the parameters of the rebuilt frontal causeway),
- the canopy and bottom of the tank will be desilted,
- swamp area - the refugium will be cleaned up of fallen trees and branches.
Dry tank - upper, total volume 2,578 m
- reconstruction of the frontal causeway,
- making a storm overflow in the form of a reinforced trapezoidal trough,
- arranging the tank bowl from scrap trees and branches (no other works will be carried out).