The Friedrich Schiller University intends to rebuild a research building Microverse Center (MCJ) in Jena.
The subject of the planned order is the construction of a high-voltage system
The heavy current lot includes the installation of the following components:
- Gebäudehauptverteilung 1600 A
- Emergency power system with diesel generator 100kVA in concrete station
- Elt sub-distributions approx. 45 pieces
- Battery-supported emergency lighting with individual detection
approx. 550 luminaires
- Underfloor floor installation boxes approx. 18 pieces
- Kabelrinnen ca. 3500 m
- General lighting with approx. 1880 luminaires
- Control for glare protection and darkening approx. 130 motors
- Installationsleitung NYM ca. 50 km
- Cable NYY + NYCWY approx. 6 km
- Schuko sockets approx. 1400 pieces
- Fire protection, equipotential bonding, connection work