Description:
AKK A 3 - Ersatzneubau BW 8.2 + 9

The tendered services of this lot include both the replacement of bridge structure 9 (4506 848) and the replacement of retaining wall 8.2

(4506 891). Both structures are located south of the AKK and will be erected about 90 m northwest of the current building. Building 9 carries the A3 via ramp F (from Venlo to Cologne) and ramp H (from Essen to Cologne). Building 8.2, which consists of two substructures, connects to BW 9 to the south. The western retaining wall will only be partially demolished. The eastern retaining wall is to be completely renewed.

The tendered services also include the refurbishment/renovation, furnishing and maintenance of a construction office.

Quantity Type of service

Demolition of existing building 9

approx. 150 m dismantling railing on superstructure/FW with wire mesh filling or spar railing

approx. 180 m dismantling of protective device on superstructure/FW

approx. 800 m2 dismantling, covering and waterproofing (incl. hand-laid edge strips)

approx. 60 m dismantling of drainage pipe incl. drains and connecting pipes

approx. 1,080 m3 dismantling of superstructures incl. cross and end cross beams (prestressed concrete)

approx. 173 m3 dismantling abutments, retaining walls, caps (reinforced concrete)

Construction of a replacement building for building 9

Earthworks

Remove approx. 410 m3 of topsoil

approx. 20,000 m3 excavation pit homogeneous areas Lös-A (incl. dam excavation)

approx. 3,300 m3 of backfilling and embankment construction

Carry out approx. 200 m3 of soil replacement (for retaining walls north-east and north-west)

Drainage works

Produce approx. 1,290 m2 of drainage layer on surfaces in contact with the ground of buildings

Produce approx. 1,080 m2 of waterproofing element between drainage layer and facing shell

900 pcs Sealing sleeve for penetrating body (anchor)

Install 143 pcs of pipes (for drainage of the area between bored piles and facing shell)

Install 36 pcs of pipes (for cross-connection of the collector pipe to the roadway drainage)

Construct approx. 185 m of drainage pipeline

Produce approx. 185 m of base pipe for drainage layer

Construct approx. 63 m drainage channel (EW superstructure) as a curb channel

Manufacture approx. 22 m of pipeline from GRP (EW superstructure)

Construct 3 inspection shafts

Work for the production of excavation pit stabilization

approx. 222 m2 production of steel sheet piling

approx. 286 m2 Production of infill Manufacture of girder pile wall for central longitudinal shoring

approx. 120 m Production of grouting anchors for re-anchoring of girder pile wall (MLV)

approx. 16 tons of fabrication strapping incl. brackets S355JR and compression stiffeners

14 pcs Manufacture ends for grout anchors

Works for Manufacturing Foundation

approx. 176 m Production of drilling template for bored pile wall

approx. 3,000 m2 production of bored pile wall

approx. 342 tons Production of reinforcing steel B500B for bored pile wall

approx. 176 m head of the bored pile wall

Formwork and concreting work

approx. 1,236 m2 Production of concrete for cleanliness layer for pile head beams, auxiliary wings, drag plates and retaining walls

approx. 2,700 m2 production of formwork for foundations, retaining walls, auxiliary sashes; Superstructures, pile head beams, transoms and facing shells.

Type of formwork and formwork course according to documents of the client

approx. 470 tons of production of reinforcing steel B500B for foundations, retaining walls, auxiliary sashes; Superstructures, pile head beams, transoms and facing shells.

approx. 2,400 m3 of reinforced concrete for foundations, retaining walls, auxiliary wings; Superstructures, pile head beams, transoms and facing shells.

Type of concrete incl. exposure class according to documents of the client

approx. 305 m3 of unreinforced concrete for backfilling the area between the bored pile walls and the facing shells

1,000 pcs production of composite anchors for the facing shells

Waterproofing and asphalt work

Prepare, seal and seal approx. 1,030 m2 of concrete surface (road slab)

Produce approx. 250 m2 of protective layer under caps

Produce approx. 770 m2 of asphalt protective layer (d=7.0 cm, MA 11 S)

Produce approx. 760 m2 of asphalt surface course (d=3.5 cm, SMA 8 S)

Demolition of existing structure 8.2

approx. 187 m Dismantling of railings on retaining walls with wire mesh filling or spar railing

approx. 500 m3 dismantling of retaining walls incl. caps (reinforced concrete)

Construction of a replacement building 8.2

Earthworks

Remove approx. 350 m3 of topsoil

approx. 12,500 m3 excavation pit homogeneous areas Lös-A (incl. dam excavation)

approx. 450 m3 Production of backfilling of buildings

approx. 14,500 m3 production of drilling platform

Drainage works

Produce approx. 1,735 m2 of drainage layer on surfaces in contact with the ground of buildings

Produce approx. 1,615 m2 of waterproofing element between drainage layer and facing shell

1,460 pcs Manufacture of sealing sleeve for penetrating bodies (anchors)

Install 289 pcs of pipes (for drainage of the area between bored piles and facing shell)

Install 27 pcs pipes (for cross-connection of the collector pipe to the roadway drainage)

Construct approx. 289 m of drainage pipeline

Produce approx. 270 m of base pipe for drainage layer

Work for the production of excavation pit stabilization

approx. 215 m2 production of girder pile wall

approx. 55 m2 production of steel sheet piling

Works for Manufacturing Foundation

approx. 270 m Production of drilling template for bored pile wall

approx. 3,510 m2 production of bored pile wall

approx. 311 tons Production of reinforcing steel B500B for bored pile wall

approx. 270 m head of the bored pile wall

Formwork and concreting work

approx. 141 m2 Production of concrete for cleanliness layer for pile head beams

approx. 4,200 m2 Production of formwork for pile head beams, transoms and facing shells.

Type of formwork and formwork course according to documents of the client

approx. 130 tons Production of reinforcing steel B500B for pile end beams, transoms and facing shells.

approx. 941 m3 of reinforced concrete for pile head beams, transoms and facing shells.

Type of concrete incl. exposure class according to documents of the client

approx. 296 m3 Preparation of unreinforced concrete for backfilling the area between the bored pile walls and the facing shells

1,460 pcs Production of composite anchors for the facing shells