Fire and rescue station 1 in the Hanseatic and University City of Rostock is to be renovated and expanded. The project is divided into 4 construction phases. The preparatory measures (repair, demolition, media supply) and the new construction of the control center building with disaster control warehouses and workshops will be implemented in the BA0+BA1 construction phases that are now being advertised and to be carried out.
The service includes in detail, among other things
Approx. 680 m² raised floor system, 5KN surface load 60 x 60 cm applied with carpet tiles Approx. 100 m² raised floor system, 5 KN surface load, 60 x 60 cm applied with linoleum tiles Approx. 260 m² cavity floor, 5 KN surface load in drywall including lino covering Approx. 80 m² cavity floor, 5 KN surface load with dry screed Approx. 22 m² cavity floor, 5 KN surface load with dry screed approx. 22 m² cavity floor, 5 KN surface load with dry screed for subsequent concrete block covering