In building A, the old training rooms are being renovated and refreshed. Building B undergoes a total renovation of HVAC, façade, windows, roof and is carried out in accordance with the Minergie standard. Building C, the central building, is home to all technical rooms that provide access to the entire area. In buildings D and E, only technical developments are created in the basement. In buildings F and G, today's double rooms are converted into single rooms with wet rooms. The new laundry will also be built in the head building. In the residential building, today's Abwartswohnung is completely renovated with window, façade, roof and interior redesigned. The environment is largely adapted.
Metal construction work on the entire site. Escape staircase in building C and a clearance staircase. Spiral staircase inside the apartment. Fall protection for windows. Internal glazing, partial fire protection.
Buildings A, B and C: Installing and assembling furniture, toilet partitions, support surface for washbasins, built-in wardrobes, bed furniture.
Residential building: kitchen, fitted wardrobes and handrail.
In building B, flooring in the corridor and wet rooms. In building C, floor and wall coverings in wet rooms. In building F-G floor and wall coverings in wet rooms. In the apartment building stairs and corridor flooring and wet rooms floor and wall covering.