Complete renovation pavilion school
cancellationdemolition work
-Partial demolition of the second floor; approx. 370m²
heaterheater
-Assembly 240lfdm heating pipes & disassembly 165lfdm
-325m² underfloor heating
-Assembling 6 radiators & dismantling 28 radiators
-Installation of 1 heating distributor with fittings
ElectricElectric
-Dismantling of electrical installation (structural condition)
-KNX connection & IT application to primary school
-Expansion of the existing fire alarm system
-Installation SSA system; 15 luminaires; 5km cable
Exterior doors and windowsExterior doors & windows
-New installation of wood/aluminium windows; approx. 36 pieces in wooden frame walls
-New installation of 3 entrance door elements
structural workstructural work
-Thermal insulation work in the basement floor inside and outside as well as minor conversions
CarpentryCarpentry
-Building construction upgrade
-New single-storey wooden stand walls; approx. 275m² with steel-stacked ceiling; approx. 370m²
MetallbauarbeitenMetallbauarbeiten
-Strengthening steel structure
-New access walkway; path length approx. 20m; incl. 2 canopies
DachabdichtungsarbeitenDachabdichtungsarbeiten
-New roof seal with slope; floor area approx. 370m²
plumbersPlumbing
-New assembly of aluminum attic cover; approx. 100 running meters
scaffolding workscaffolding work
-Scaffolding work for demolition and carpentry work; approx. 600m²
SonnenschutzarbeitenSonnenschutzarbeiten
-New assembly of venetian blinds; approx. 36 pieces; in wooden frame walls
SanitarySanitary
-Assembling 21 pcs san.Items & disassembly 16 pcs
-Installation 208m drinking water pipe & dismantling 60m
-160 running meter dirt and rainwater pipe
-20 pcs sanitary mounting elements for lightweight walls
-1 drinking water softening system
-Mounting 4 pcs wall-mounted fans