The assignment includes deliveries of natural sand (bed sand) to boilers 5, 6 and 7 at the CHP plant in Västerås.
Mälarenergi intends to sign a framework agreement with one (1) supplier. The estimated annual volume is difficult to determine depending on the variation of boiler operation but is estimated at about: 11,000 tons for all three boilers.
The assignment includes deliveries of natural sand (bed sand) to boilers 5, 6 and 7 at the CHP plant in Västerås.
Mälarenergi intends to sign a framework agreement with one (1) supplier. The estimated annual volume is difficult to determine depending on the variation of boiler operation but is estimated at about: 11,000 tons for all three boilers.