LV 303 - Carpentry and façade construction work
The carpentry and façade construction work concerns the school building, which was built in the 70s in reinforced concrete skeleton construction. The other surrounding school buildings and sports facilities are not part of the measure.
LV 303 - Carpentry and façade construction work
For the existing middle school, the following services are required:
- Holztafelkonstruktionen;
- Timber frame walls, partly in front of reinforced concrete wall;
- Außenwandelemente;
- Window elements, partly m. closed parapet;
- Facade elements partly m. door, incl. lintel elements;
- mullion-transom façade, incl. doors and windows, wood-aluminum;
- roof light strip;
- Surface protection on wood and aluminium;
- incl. glazing;
- door fittings with locking system;
- window fittings;
- Venetian blind sun protection;
- Attikaelemente;
-Glaspaneele;
- façade cladding, incl. substructure;
- steel frame extension;
- Beamed ceilings;
- digital measurement of the façade and the existing components;
- RAL external monitoring;
- workshop and assembly planning;
- Glasstatik;
- Transportgenehmigungen;
- Kleingerüstflächen;
- create as-built documentation;
- weather protection, emergency sealing;