As the project sponsor for the city of Hennigsdorf, the client plans to build a functional swimming pool. The new functional swimming pool should consistently be based on the minimum requirements for public use, use by school and club swimming and health-promoting offers.
This tender includes lot 400 03 - pool water technology.
- 2 pieces of pressure filter tank diam. 2,600 mm including filter filling;
- 1 piece pressure filter tank diam. 2 200 mm including filter filling;
- 1 circuit for 3 pools (310 m
- including circulation pumps, aggregates, fittings and accessories;
- 1 piece flushing waste water storage tank approx. 20 m
- Approx. 1,300 m of pipelines as PE pipes DN 32 to DN 350 including shaped u. Connectors;
- approx. 1,200 m of pipes as PVC pipe DN 12 to DN 80 including form and Connectors;
- including complete switch cabinet system with MSR u. Cable installations, including the construction of a central building management system with connection of external trades (heating and ventilation technology).