Execution of the construction works of the Arena of the city of Crès/
-Vrd - earthworks
- Foundation - structural work
- Steel structure
- Roofing - waterproofing
- Absorbent stretched canvas
- plastering - insulation - false ceilings
-électricité - cFO - cfa
-Cvc
-Elevator
vrd - earthmovingearthworks, sewerage networks EP, Eu/Ev;
Drinking water supply networks, Cfo/CFA electricity, outdoor lighting, telecommunications;
Roads and exterior locksmiths
Foundation - Structural workEarthworks,
Foundation work,
underground indoor and outdoor networks,
paving and reinforced concrete structures,
Masonry
Metal frameMetal frame
cover - waterproofingslab roofing on pedestals, wooden decking;
liquid tightness, thermo-acoustic;
inaccessible green roof;
Absorbent stretched canvasAbsorbent stretched canvas
Plastering - Insulation - False Ceilingspartitions, plasterboard;
plasterboard lining;
absorbent lining;
false ceiling, plasterboard;
absorbent false ceilings;
electricity - CfO - CFAground network,
Electrical distribution of high current,
Enedis network connection of the arena,
protection against the indirect effects of lightning,
electrical panel,
Low-voltage switchboard,
battery and capacitors,
Divisional tables,
td Scenic,
Outdoor socket terminal,
emergency shutdown,
Video surveillance alarm system - intrusion - SSI,
Vdi Network,
Lighting
Precautionary measures for the production of photovoltaic energy,
CVCmechanical ventilation,
aeraulic networks,
heating, air conditioning, ventilation,
Equipment: Radiators, Electric Convectors and Fan Coils
Elevator630kg lift without roof entrance