013 concrete work
Construction of the shell for a two-storey building, consisting of:
Technical duct (UG1) in WU concrete: approx. 160m3
Floor slab in WU concrete: approx. 400m3
Interior walls + ceilings in reinforced concrete: approx. 775m3
Exterior walls in infra-lightweight concrete (ILC 600): 450m3
as well as two prefabricated staircases
Preparatory actions:
Subsoil improvement by means of vibrating tamping columns ø60cm, depth: 6-7m
Introduction of gravel bedding under BoPl: approx. 430m3
Introduction of glass foam crushed stone under BoPl: approx. 1015m3