Object planning – outdoor facilities LPH 2 to 9, engineering structures LPH 3 to 9 and traffic facilities LPH 4 to 9
For the seven sub-measures of the individual measures here: B,D,E+F,I,K,Ka and O
At the naval base Eckernförde, both new construction and renovation measures of the technical area are planned. The technical area measure shall comprise the following specific measures:
1.Construction phase "New building"
-Sub-measure B - Renovation of building 58 (including demolition of building 63) and extension of boat halls and workshop (approved costs 10,070,360.85 €)
-Sub-measure D - New construction of protective roofs and storage areas SEK-M (today KSM)
(Approved costs €3,890,430.63)
-Sub-measure E+F - New construction of protective roofs and storage areas MSK, Other granaries, KranTrp warehouse and container storage areas
(Approved costs €5,436,870.84)
-Sub-measure I - New construction of equipment for vehicle and equipment washing (approved costs 2,017,634.54 €)
-Sub-measure K + Ka - New parachute drying tower and parachute test group
(Approved costs 4,913,438.69 € parachute drying tower / Costs submitted for approval Parachute test group 10,451,000.00)
2.Construction phase "Renovation"
-Sub-measure O - Renovation of building 65 (approved costs € 3,156,458.63)
The planned measure is a large construction project (GNUE) of the BMVg. Ew-Bau is approved. There is an execution order from 08.02.2021 according to RBBau section E4 in which the total amount of the approved costs in the amount of 29,486,000 € is shown (without the share of the measure Ka – test group).
The ES-Bau for the measure Ka – Parachute Test Group was submitted for approval with a cost of 10,451,000 €. Due to the technical connections, this measure has been included in the measure of the technical area, specifically to the measure K – parachute drying tower.
The client intends to award the following specialist lots to a contractor.
1.)Fachlos 1: Freianlagenplanung
Fee zones and costs:
Sub-measure B: Fee zone II, KG 500 Share of outdoor facilities approx. € 32,000 gross
Sub-measure D: Fee zone II, KG 500 Share of outdoor facilities approx. € 56,000 gross
Sub-measure E+F: Fee zone II, KG 500 Share of outdoor facilities approx. € 76,000 gross
Sub-measure I: Fee zone III, KG 500 Share of outdoor facilities approx. € 24,000 gross
Sub-measure K: Fee zone III, KG 500 Share of outdoor facilities approx. € 53,000 gross
Sub-measure Ka: Fee zone III, KG 500 Share of outdoor facilities approx. € 198,000 gross
Sub-measure O: Fee zone II, KG 500 Share of outdoor installations approx. € 8,000 gross
2.)Lot 2: Civil engineering structures
Fee zones and costs:
Sub-measure B: Fee zone II, KG 210+500 € 2,330,000 gross,
Conversion surcharge is granted
Sub-measure D: Fee zone II, KG 210+500 approx. € 1,550,000 gross
Sub-measure E+F: Fee zone II, KG 210+500 approx. € 1,500,000 gross
Teilmaßnahme I: Honorarzone III, KG 210+500 approx. 504.000 € gross
Sub-measure K: Fee zone III, KG 210+500 approx. € 1,400,000 gross
Sub-measure Ka: Fee zone III, KG 210+500 approx. 165,000 € gross
Sub-measure O: Fee zone II, KG 210+550 approx. € 360,000 gross, conversion surcharge is granted
3.)Lot 3: Traffic facilities
Fee zones and costs:
Sub-measure B: Fee zone II, KG 520 approx. 650,000 € gross, conversion surcharge is granted
Sub-measure D: Fee zone II, KG 520 approx. € 1,135,000 gross
Sub-measure E+F: Fee zone II, KG 520 approx. € 1,510,000 gross
Teilmaßnahme I: Honorarzone III, KG 520 approx. 63.000 € gross
Sub-measure K: Fee zone III, KG 520 approx. € 58,000 gross
Sub-measure Ka: Fee zone III, KG 520 approx. 220,000 € gross
Sub-measure O: Fee zone II, KG 520 approx. 135,000 € gross, conversion surcharge is granted
A detailed service description as well as other procedure-related procurement documents are posted on the e-procurement platform for the procedure under https://www.meinauftrag.rib.de/public/DetailsByPlatformIdAndTenderId/platformId/7/tenderId/121002922.