The construction work to be carried out is dredging work to maintain and restore the required target depths and widths in the fairway and in the fairway of the Lower and Outer Elbe. The total output includes the dredging of 15.5 million m
The start of the contract is 1.5.2021. The contract ends on April 30, 2022.
According to §3a EU (3) No. 5 VOB / A-EU, edition 2016, it is intended to additionally award the following services in the negotiated procedure:
A] repeat order for 6 months,
B] Repeat order for 6 months.
The construction work to be carried out is dredging work to maintain and restore the required target depths and widths in the fairway and in the fairway of the Lower and Outer Elbe. The total output includes the dredging of 15.5 million m
The start of the contract is 1.5.2021. The contract ends on April 30, 2022.
According to §3a EU (3) No. 5 VOB / A-EU, edition 2016, it is intended to additionally award the following services in the negotiated procedure:
A] repeat order for 6 months,
B] Repeat order for 6 months.