The new building of the sports hall will be built on the area of the previous sports field at the school between the school building and Waldschmidtstraße.
The building is predominantly a reinforced concrete structure with EIFS. The roof of the sports hall is hipped. The
Roof construction is designed as an explosive device with wooden trusses and steel tension struts. Buildings for
changing rooms, plumbing, technology, equipment and gallery with a green flat roof.
Exterior building dimensions: approx. 38 x 45 m
Building height: approx. 14 m
masses:
approx. 150 m2 floor tiles
approx. 205 m2 wall tiles
approx. 15 pcs wall mirror
Events:
Total execution period: 13.02.2023 – 26.06.2023
W+M planning: 13.02.2023 – 06.03.2023
Tile work: 06.06.2023 – 26.06.2023