The work concerns the project to build a metropolitan swimming pool north of the Metropolitan Tourangelle, in Fondettes, on a site that covers a total surface of 16,956 m
- a body of water covered by 5 water lines,
- a fun pool,
- a relaxation and well-being area
- a pentagliss,
- a paddling pool
And outside:
- mineral beaches and a plant solarium
- a water playground.
Of the 17 lots comprising the Aquatic Center construction works, all the lots were awarded apart from Lot 7, which is therefore re-launched in the call for tenders. The duration of 20 months concerns all 17 lots.