With the development of development areas and the settlement of companies at the Schwarze Pumpe industrial site, additional measures are needed to ensure the supply of the low-sulfur process and process water (SAW) to the residents.
As a result, the industrial park Schwarze Pumpe will be equipped with a treatment plant for the treatment of 15 500 m
Subject of the contract are engineering services according to the current version of the HOAI for the planning of a service and process water purification and distribution system (BPRVA) from the performance phase 4. The plant must be planned and constructed according to the state of the art or the best available technology.
Commissioning (start of trial operation) of the plant is planned for April / 2020.
A detailed description of the procurement can be found in the document "181126 ASG BPRVA Task.pdf".