Planning services for technical building equipment, equipment groups 1, 2, 3 and 8 (HOAI, §53 ff, Lph. 3-4, 5-7 and 8-9) The city of Aalen intends to develop a school campus Braunenberg on the existing site of the current Braunenberg School ,
The concept envisages the spatial integration of a 3-group day-care center (extension option to 6 groups - although this is not part of this procedure), a full-day elementary school and a special education and counseling center (SBBZ).
It is intended to phase out the work phases in line with the funding. There is no legal claim to the commission of further service phases. The scope of services includes all planning tasks and all necessary additional services that belong to the proper and complete execution of the planning or are required.
The city of Aalen intends to develop a school campus Braunenberg on the existing site of the current Braunenberg School.
The concept envisages the spatial integration of a 3-group day-care center (extension option to 6 groups - although this is not part of this procedure), a full-day elementary school and a special education and counseling center (SBBZ).
In the field of sanitary engineering, the renewal of the domestic connection and the complete distribution of drinking water is required. In addition, the piping in the building and all sanitary facilities to be renewed. In addition, the construction of a new underground network for drainage will take place.
For heat engineering, the connection and design to a district heating network is provided. New exhaust air and partial supply air systems are as much an integral part of the measure as an air conditioning of the technical rooms.
In the area of building automation, the entire building is to be equipped with a central building management system.
The extension and refurbishment measures are carried out in 3 consecutive construction phases:
1st BA:
- demolition / demolition connecting building between pavilion East and West,
- partial demolition of the existing pavilion plant; Roof renovation,
- New construction of a 3-group kindergarten,
- Renovation of Gymnasium East,
- New building full day care in the EC with Teilunterkellerung.
The cost (Kgr. 200-700) is roughly estimated at 4.60 million EUR net. Planned completion: until 06/2022.
2.BA:
- Inventory rehabilitation primary school,
- Extension class tract,
- new administration,
- Renovation pavilion for specialist rooms.
The costs for this (Kgr. 200-700) are roughly estimated at 3.49 million EUR net. Planned completion: until 03/2024.
3rd BA:
- Conversion of the special educational education and counseling center.
The cost of this (Kgr. 200-700) is roughly estimated at EUR 1.32 million net. Planned completion: until 02/2025.
A planning overview of the individual construction phases is enclosed with the tender documents.
The presented measures are based on a feasibility study, which was created about the upcoming project. For this purpose, the preliminary planning with a planning depth up to and including Lph. 2 already created and set up a room program.
Any further planning must be based on these requirements, which have already been agreed upon and approved by the responsible bodies.
For the extension and renovation of the Bildunsgcampus Braunenberg, the planning services for technical building equipment, equipment groups 1, 2, 3 and 8 (HOAI, § 53 ff, Lph. 3-4, 5-7 and 8-9) are to be awarded.
In the first commissioning stage, first, the service phases 3 and possibly 4 (design planning and approval planning) are to be commissioned in accordance with § 53 HOAI. The respective construction phases are also retrieved individually.
There is no legal entitlement to commission further service phases or stages of assignment with regard to extension and / or reorganization (see II.2.11)).
Start Lph. 3: 01/2020 Start of construction: 09/2020 Complete completion: 02/2025