Metal construction work for the fire protection renovation of the neurot school and learning studio 3.
06-metal construction / window work
A new window element including sun protection and window sill must be installed in the enlarged opening of the teacher's office. The learning offices are sealed off from the staircase with 2 glass-aluminum tubular frame doors (T30-RS). The teacher's office is separated from the learning office with a glass wall. The open stairs in the stairwell are closed with sheet metal construction (risers). Exchanging existing doors according to the fire protection concept approx. 210 m