Steam turbines | Tenderlake

Steam turbines

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 December 2016
Closing Date:
27 January 2017
Location(s):
DK021 Østsjælland (DK Denmark/DANMARK)
Description:
HØK — Renewal of CHP plant — Helsingør.

Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in

Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the

site.

The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised

for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run

combined cycle plant and bio boiler plant in parallel. The combined cycle plant will mainly be used as a back-up.

The new biomass fired plant will consist of a boiler unit with flue gas cleaning and flue gas condensation. There

will be a power output of 62 MW (steam flow 20,8 kg/s). Nominal design data will be 500°C/64 bar(g).

The scope of the inquiry will cover a steam turbine, generator and gearbox within the specified battery limits.



The procurement consists of a complete steam turbine with necessary auxiliary systems. The steam turbine will be located in a new building adjacent to the existing combined cycle building.

The scope includes design, engineering, manufacturing, delivery and erection of all equipment and systems as well as the commissioning and final testing of the steam turbine. The scope also includes training of the Purchaser's staff as well as operation and maintenance instructions for the plant.

Download full details as .pdf
The Buyer:
Helsingør Kraftvarmeværk A/S
CPV Code(s):
42112000 - Turbine installations
42112100 - Steam turbines