New construction of workshop building E + Mensa B with connecting building, 2.BA
Construction site equipment, safety measures, earthworks, structural work: St-concrete, insulation and waterproofing work, underground pipes under floor slab and outside, timber construction work: wooden trusses + plastic window elements
Construction site equipment: crane/cranes incl. crane operator, surveying work. Safety measures: approx. 205.0m prov. railing, approx. 15 pieces of shaft platforms in the elevator and supply shaft, approx. 25 pieces of protection of doors and windows in the existing building, approx. 196 steps with finished surface protection, various protective measures. Demolition work in the outdoor area: approx. 87m3 concrete demolition in the outdoor area, approx. 950m2 demolition of paving of different sizes incl. base course, various demolition work in the outdoor area such as railings, benches, courtyard inlets, steps, angle retaining walls, etc. Earthworks: approx. 8,400m3 excavated soil mostly sandy soil, partly loaded (Z1.1, Z1.2, Z2 and DKII), approx. 2000m3 trench and foundation excavation, approx. 560m2 sheet piling in sandy soil, incl. stat. Calculation and planning. Structural work: approx. 1300m3 wall concrete, incl. formwork and reinforcement, inside and outside, approx. 270m3 covered concrete incl. formwork and reinforcement, inside and outside, approx. 123m3 column concrete incl. formwork and reinforcement, inside and outside, approx. 3119m2 slab concrete incl. formwork and reinforcement, approx. 350m3 beam concrete incl. formwork and reinforcement, approx. 3063m2 cleanliness layer, approx. 1128m3 floor slab concrete incl. formwork and reinforcement, approx. 116m3 foundation concrete incl. formwork and reinforcement, approx. 385m2 concrete smoothing work, approx. 365m2 semi-precast walls, approx. 24 prefabricated staircase runs of different sizes, approx. 1 piece prefabricated light well, approx. 18 pieces prefabricated columns, approx. 46 m2 semi-precast slabs, approx. 38 pieces of fully precast beams, approx. 4,386 pieces of reinforcement screw connections, approx. 3000m of tension strands, monostrand without composite, 15.7mm, approx. 104m 3 masonry D= 24cm, approx. 150 pieces of punching reinforcement, various installations in prefabricated, semi-precast and in-situ concrete constructions such as conduits, rails, e-sockets. Insulation and waterproofing work: approx. 3143m2 insulation under floor slab, 040, D= 120mm, approx. 657m2 insulation exterior walls, 035, D= 180mm, approx. 2,621m2 fresh concrete composite film under floor slabs, approx. 587m2 fresh concrete composite film vertically on outer walls, approx. 86m joint clamping flange construction, approx. 10m external construction joint tape joint tape. Ground pipes: approx. 410m underground pipes under the floor slab and in the outdoor area including fittings and connections to existing shafts, empty pipes and equipment boxes, approx. 6,000m installation pipe in concrete DN 32mm and DN 25mm, approx. 3800 pieces of equipment junction boxes for concrete paving. Timber construction: approx. 8 pieces Wooden trusses 25/80-108cm, length 960cm incl. support constructions made of steel elements Window elements made of plastic: approx. 18 pieces Plastic elements 210x220cm with rotary-tilting and tilting sash