Construction work | Tenderlake

Construction work

Contract Value:
DKK 30M - 30M
Notice Type:
Contract Notice
Published Date:
17 June 2022
Closing Date:
20 July 2022
Location(s):
DK05 Nordjylland (DK Denmark/DANMARK)
Description:
Heat pump - Wastewater Treatment Plant East

The turnkey contract concerns the purchase, delivery, assembly incl. start-up and commissioning of a complete heat pump system excluding building and exchanger circle with wastewater. The heat pump system is based on treated wastewater. The heat output of the heat pump system is approximately 6000 kW at a wastewater temperature of 8°C and a district heating temperature of 75 degrees. The heat pump system must be based on a natural coolant. Total turnkey contract must be CE marked before delivery.

The turnkey contract generally includes the following works:

• Supply, installation of heat pumps

• Rørarbejde

• Circulations and distribution pumps

• Pressure hold and filters

• Other components

• Elinstallation and transformeranlæg

• Control and regulation of heat pumps and the overall heat pump system

• Club agent detection and alarm

• Emergency and normal ventilation

• Commissioning and training of the client's employees

• Grace and warranty test

• Permits for the installation and operation of the heat pump system

Download full details as .pdf
The Buyer:
Aalborg Forsyning
CPV Code(s):
45000000 - Construction work
45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
45310000 - Electrical installation work
45317100 - Electrical installation work of pumping equipment
45331000 - Heating, ventilation and air-conditioning installation work
45350000 - Mechanical installations