A 2, A 9, km 0-11, li RF with A 10, km 97-98 AD Potsdam, Ast HS and NE, A2, A9, A10_Los 3 traffic sign bridges
- approx. 770 m² Baugrubenverbau
- approx. 166 t demolition of steel construction
- approx. 306 m³ demolition of reinforced concrete parts
- approx. 1663 m³ excavation pit/earthworks
- approx. 630 m³ reinforced concrete for foundation and impact base
- approx. 735 m³ Baugrubenverfüllung
- approx. 300 t of section steel for supporting structure
- approx. 3750 m² Korrosionsschutzfläche
- approx. 98 m² granite paving area as a hollow
- Assemble approx. 1 piece of large-scale signposts A = 12.5 m²
- approx. 12 pieces of execution and as-built documents
- Manufacture and assemble approx. 15 traffic signs