The purpose of this procurement is to contract a contractor to execute contract ‘M011 Automation’.
The contract includes:
Automation components.
Central operational control plant.
For a more detailed description of this contract's scope, refer to Part B Work Scope and Payment and Part F Drawings.
Optimalisation process.
After the contract has been signed there will be an optimalisation period of approx. 6 months in contract ‘M005 Internal construction work and technical installations’.
The aim of the optimalisation period is to:
1. Reduce the risk for the builder and contractor.
2. Give optimal technical systems.
3. Ensure predictability and rational production.
4. Reduce project costs.
5. Create trust between the builder and contractor, team-building.
Contract ‘M011 Automation’ must reckon on participating in parts of this process for the coordination of progress and technical systems.
Design phase.
A design phase in two stages for a total length of approx. 6 months shall be carried out for contract ‘M011 Automation’ after the contract has been signed:
1. Provisional design.
2. Final design.
The total work basis shall be agreed and determined during this phase.