Project description: Extension and extension of a laboratory building for the pre-clinic of the dental faculty of the University Hospital Tübingen including large rooms for phantom room and technical center. Extension in steel skeleton construction with wall elements made of aerated concrete, extension in solid construction made of reinforced concrete, both parts of the building with flat roof construction.
- NUF: 1 166 m
- GFA: 1 820 m
- BRI: 7 899 m
- 1 pc. Element planning of wall panels digital;
- Make 1 pc calculations;
- approx. 360 m
- 1.5 t reinforcing steel mesh B500A;
- approx. 360 m
- Seal approx. 800 m of component joints.