As part of the planned overall urban development measure “Western Old Town” as part of the “Urban Monument Protection” funding program, the important historic community center Norderstraße 8/10 (“Eckenerhaus or “Alt-Flensburg House”, usable area approx. 1,090 m²) is to be restored and modernized in accordance with the listed requirements, as well as the Cultivation from the 70s. In this context, a usage concept was developed, based on museum use on the ground floor, a café and public training and event rooms. The goal is a multifunctional use and creation of a place for historical and cultural information. The engineering services of technical building equipment are to be provided in accordance with service phases 1-9 of HOAI § 53 et seq.
Engineering services for technical building equipment, service phases 1-9 § 53 ff
HOAI for the following project: As part of the planned overall urban development measure “Western Old Town” in the funding program “Urban Heritage Protection”, the important historic community center Norderstraße 8/10 (“Eckenerhaus or “Old Flensburg House”, usable area approx. 1,090 m²) is to be restored in accordance with the listed buildings and as well as the extension from the 1970s. Within this framework, a usage concept was developed, based on museum use on the ground floor, a café with public training and event rooms. The goal is a multifunctional use and creation of a place for historical and cultural information. The following measures are planned for the Eckenerhaus:
- Refurbishment of the historic facades and underpinning of the utluchten
(street façade) and the partially bagged floors on the ground floor
- Cancel the previous one. ventilation systems and elevator systems from the time of
restaurant use
- Installation of a new escape route staircase according to LBO
- installation of a barrier-free lift (corner loader) for barrier-free access to the ground floor,
OG and DG.
The basement level is not accessible by lift.
- gutting of the attic and energy-efficient renovation of the attic
- Demolition of the staircase extension on the side wing in the yard
- Production of a new external staircase as a replacement for the broken staircase on
side wings
- Construction of a new 2nd escape route from the vaulted cellar, including production
an external cellar staircase
The planning for the cultivation from the 1970s - Norderstraße 10 relates to the following measures:
- the existing arcades on the ground floor are omitted and will be used in terms of area
Use assigned on the ground floor
- Demolition of the existing staircase across all floors and making
new floors in this area.
- Demolition of the inner walls on the ground floor including demolition of the floor and foundations.
- renovation of the ground floor facade: creation of new masonry openings,
Enlargement of window and door openings and installation of new lintels.
- Refurbishment/addition of the facing facade
- Creation of a new sole including foundations
- Energetic upgrade of the new ground floor façade (interior insulation)
- Installation of new window and door elements on the ground floor