New construction of the Rothenburg/O.L. secondary school with outdoor facilities
Lot 013 Shell construction, basic pipes, drainage, earthworks
approx. 5,600 m³ excavated soil; basic lines; approx. 4,750 m³ of concrete; approx. 750 t steel; 16 pcs of precast staircases; 70 m² KS masonry