The object of the order is the execution of the design documentation with the arrangements, permits, any necessary changes and on that basis, the delivery, installation, commissioning and connection to the OSD network of the MWS rooftop solar installation, including the adjustment of the infrastructure electricity in the Port of Gdynia as part of the first phase of the project “Opportunities Analysis and Application of Renewable Energy Technologies in Port Gdynia”. The total electrical installed capacity shall be not less than 499,00 kWp and shall not exceed 500,00 kWp. In addition, the PV installation and all equipment included must enable them to be classified as a small installation in accordance with the requirements laid down in the RES Act and allow entry into the register of power generators in a small plant. MWS is located at 4 Logista Street in Gdynia.
Detailed description of the item of the order:
1) design stage,
2) implementation stage (delivery, assembly, adjustment of infrastructure, commissioning, transfer to operation of the installation).
The detailed scope of the item of the order is specified in Chapter IV of the SWZ (Description of the Order Object).