This contract is composed of 2 tranches, each of which includes mission elements for infrastructure works pursuant to articles R.2431-24 to 31 of the French Public Procurement Code.- 1 firm tranche relating to the design and monitoring of the construction of the infrastructure of the incubator's buildings: Sample mission: Avp, Pro-Dce, Act, Visa-Det, Aor and Complementary missions: diagnosis and preliminary studies, preparation and follow-up of water law files, geotechnical studies (G2 and G4 mission), partial exe, mission to synthesize the execution plans of the works and OPC-1 optional tranche relating to the design and monitoring of the construction of production equipment inseparable from the buildings, which can be the subject of a tailor-made design: - Sample mission: Avp, Pro-Dce, Act, Visa-Det and Aor and Additional missions: Partial exe, mission of synthesis of the execution plans of the works and Opc
This contract is composed of 2 tranches, each of which includes mission elements for infrastructure works pursuant to articles R.2431-24 to 31 of the French Public Procurement Code.- 1 firm tranche relating to the design and monitoring of the construction of the infrastructure of the incubator's buildings: Sample mission: Avp, Pro-Dce, Act, Visa-Det, Aor and Complementary missions: diagnosis and preliminary studies, preparation and follow-up of water law files, geotechnical studies (G2 and G4 mission), partial exe, mission to synthesize the execution plans of the works and OPC-1 optional tranche relating to the design and monitoring of the construction of production equipment inseparable from the buildings, which can be the subject of a tailor-made design: - Sample mission: Avp, Pro-Dce, Act, Visa-Det and Aor and Additional missions: Partial exe, mission of synthesis of the execution plans of the works and Opc