Master builder's work: reinforced concrete works, earthworks and shoring works, drainage and sewer works, electrical work, shell construction for the
New construction of a three-storey day-care centre with a four-group crèche, a 2-group kindergarten and six residential units on the second floor. The building will be built on an elastically bedded reinforced concrete floor slab. In order to support the outer wall, a single foundation is required in the case of building recess. Due to the presence of groundwater, the partial basement must be designed in watertight construction. Furthermore, due to the high groundwater level during the construction of the basement, a watertight excavation pit shoring (sheet pile wall shoring) is required. In addition, a development core in solid STB construction is planned for the upper floors. Stairs are made of prefabricated reinforced concrete elements. On the upper floors, the building is planned as a timber construction with cross-laminated timber construction in visible quality.
- Execution of the master builder's work
approx. 750 m³ excavation
approx. 400 m of excavation supply lines
approx. 200 m³ excavation trench system
- installation
ca. 650 m² Stahlspundbohlen
- water retention
3 St Schmutzwasserpumpen
ca. 50 m Förderleitungen
- reinforced concrete work
approx. 750 m² floor slabs
ca. 250 m² Aussenwände
- Thermal insulation of floor slab and walls
ca. 900 m² Wärmedämmungen
ca. 185 m² Aussenwände WU - Concrete
- Ceiling construction
ca. 380 m² Stahlbetondecken
approx. 450 m² reinforced concrete interior walls
- Sewer work
approx. 350 m sewage pipes
ca. 100 m³ Rohrleitungsgräben
- electrical installations
ca. 550 m Erdungsanlagen