22E0586 (LBB NL Koblenz) Bw-Zentralkrankenhaus Koblenz-Metternich - New construction 1st phase operating theatre and functional building / painting work
Painting, Interior Plastering II :
12,830 m gypsum plaster window reveal (w = 0.15 – 0.3 m); 1,000 m lime cement plaster window reveal (w = 0.15 – 0.3 m); 12,000 m of plastering work close Sclitze; 22,000 m² of coating GK metal stud walls; 38,300 m² coating STB/masonry walls; 9,350 m² coating GK ceilings; 595 pcs. coating of steel doors (w= 1.0 – 2.635 m); 48,300 m connection joints (up to 10 mm wide)