On the basis of IT SiG, the University Hospital Leipzig is upgrading the infrastructure of the data network on the entire Liebigstraße campus. The existing fiber data network is expanded, equipped with decentralized 1 GB miniSwitches and executed redundantly to ensure the necessary availability. The miniswitche power supply is reinstalled as a central UPS power supply. At the same time, the existing wireless supply will be expanded to a full range of availability. The construction project includes all heavy and low-current engineering as well as all associated structural work. All work takes place in stock, for the most part under conditions of use and in compliance with hospital-specific hygiene.
After the laying of the cable and the associated structural measures, ceilings and walls have to be restored roomwise.
The medical operation must not be affected during execution. The construction works take place in parallel construction phase, room and building style.
The following services are to be performed:
— plastering of breakthroughs (approx. 950 pcs),
— remove contamination and stain filler on ceilings and walls (approximately 100 m
— coating of plastered breakthroughs (approx. 390 pcs)
— coating plasterboard and reinforced concrete ceilings (approx. 7 000 m
— coating plasterboard and masonry walls (approx. 150 m
— Overhaul coating for all types of walls and ceilings mentioned (approx. 20 m