Sewage, water, gas equipment:
The rain and sewage pipes in the building are laid in SML and plastic pipe. All new sewage pipes receive complete structure-borne sound insulation.
All breakthroughs with fire protection requirements are secured with approved bulkheads against smoke and fire transmission.
Water systems:
The newly laid drinking water, hot water and circulation pipes are installed in a stainless steel press system. All water supply piping will receive insulation compliant with the standard.
All breakthroughs with fire protection requirements are secured with approved bulkheads against smoke and fire transmission.
In the sanitary areas furnishings are provided according to the requirements.
- sewage pipes DN 50 - DN 150 approx. 480 m,
- drinking water pipes made of stainless steel DN 12 - DN 65 approx. 1 000 m,
- Furnishings about 70 pcs,
Shower installations with shower channel and flushing fittings 28,
- Hygiene articles approx. 100 St.
- Electric water heater approx. 5 hours,
- Pipe fittings DN 15 - DN 65 35 pcs,
- Hygiene flushing system 1 pc.,
- Pipe insulation with metal jacket / plastic jacket 450 m,
- pipe insulation 680 m,
- Valves insulation caps 30 pcs.