This consultation concerns a contract with an adapted works procedure which aims at the redevelopment of the premises located in the mezzanine of the headquarters of the CAF de la Moselle and part of the 6th floor (only Demolition lot for the 6th floor)
False ceilings / plaster partitioningFalse ceilings / plaster partitioning
Flexible floor coveringsFlexible floor coverings
interior joinery/layoutinterior joinery/layout
Wallcoverings / paintWallcoverings / paint
Air conditioning / Ventilation / HeatingAir conditioning / Ventilation / Heating
Demolition before redevelopmentDemolition