Construction of a new fire station in Kemnath.
The fire station will be divided into 3 construction phases:
Construction phase 1: vehicle hall + workshop (floor area: approx. 58.00 m x 18.00 m)
Construction phase 2: Fire brigade tower
Construction phase 3: Social wing (floor area: approx. 57.00 m x 24 m)
The roof construction of the vehicle hall (gable roof) and the workshop (monopitch roof) consists of glulam trusses
and cross-laminated timber panels. The social wing will have a reinforced concrete ceiling with a flat roof structure above it.
On the social wing, a granny flat with an additional three storage rooms in timber frame construction is planned.
(Floor area: approx. 14.50 m x 25.5 m) All roofs will receive extensive green roofs
LOT 1: TilesLOT 1 Tiles:
Adhesive bridge wall and floor, approx. 2000 m²
Painting insulation wall and floor, 1100 m²
Wall tiles, approx. 810 m²
Floor tiles, 30/60 R10, approx. 610 m²
Floor tiles, 30/60 R9, approx. 160 m²
Floor tiles, 30/60 R11, approx. 150 m²
Floor tiles, 30/60 R11 V4, approx. 60 m²
THE 2: RüttelklinkerRüttelklinker:
Floor tiles, slip resistance class R12, 20/20 cm, approx. 1150 m²