Preparatory work and workshop planning for various steel components,
Delivery and installation of stair railings and stainless steel handrails, garbage room and bicycle parking as steel construction with trapezoidal sheet metal covering and drainage, steel railings outside, delivery and installation of short aluminum prefabricated stairs in adjoining rooms
Basement to 2nd floor inside, outside
•Werkstattplanung
•Handrail stairs stainless steel approx. 150 m
•Railing steel approx. 2,500 kg
•Attic railing posts and round steel 22 mm, approx. 290 m
•Garbage room and bicycle parking
HEB 120 approx. 1,700 kg
Trapezoidal sheet metal 100/275 approx. 60m²
•Other
Fire extinguisher Adjustment cabinets approx. 12 pieces
Briefkastenanlage
Schachtabdeckungen
Aluminum prefabricated stairs
•Grating mounting pit
Grating 30x30 mm approx. 15m²
Support angle approx. 220 kg