Heating equipment | Tenderlake

Heating equipment

Contract Value:
PLN 3M - 3M
Notice Type:
Contract Notice
Published Date:
02 January 2023
Closing Date:
03 February 2023
Location(s):
PL823 Rzeszowski (PL Poland/POLSKA)
Description:
Supply of heat storage tanks and diaphragm vessels for the needs of heat nodes" divided into two Parts

The subject of the contract is: "Supply of heat storage tanks and diaphragm vessels for the needs of heat substations" divided into two Parts.

Part 1: Supply of heat storage

Part 2: Supply of diaphragm vessels

Supply of heat accumulators

1. The subject of the contract is: Supply of heat storage tanks

2. The details of the subject of the contract and its scope shall specify:

2.1. Appendix No. 1 to SWZ.

2.2. Annex 4 to the SWZ ("Technical requirements for domestic hot water storage tanks").

3. The devices being the subject of the order must be brand new, unused, i.e. manufactured not earlier than 6 months before the date of their delivery to the Ordering Party.

4. The equipment which is the subject of the contract must meet the requirements of:

- the Act of 16 April 2004 on construction products (consolidated text, Journal of Laws of 2021, item 1213, as amended) together with the implementing provisions to this Act,

- the Act of 30 August 2002 on the conformity assessment system (i.e. Journal of Laws of 2021, item 1344, as amended),

- Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC.

- Regulation of the Minister of Development of 11 July 2016 on requirements for pressure equipment and pressure equipment assemblies (Journal of Laws of 2016, item 1036) introducing Directive 2014/68/EU into Polish law (applies to Part 2) and must meet EU ecological standards set out in

announcements of the President of the Polish Committee for Standardization on the list of harmonized standards.

5. The equipment which is the subject of the contract must have:

- A declaration of conformity or a copy of the declaration of performance in accordance with the applicable standards and regulations in this regard.

- National Declaration of Performance for the supplied thermal insulation,

- Hygienic certificate PZH.

6. The required minimum period of quality guarantee for the subject of the contract: 60 months from the date of their protocol acceptance.

Warranty in accordance with the conditions set out in Chapters XVI and XIX of the SWZ.

7. Other conditions of the Ordering Party regarding the subject of the contract are specified in Chapter XIX of this SWZ entitled "PROVISIONS OF THE PUBLIC PROCUREMENT CONTRACT RELEVANT FOR THE PARTIES".

Shipping of diaphragmatic vessels

1. The subject of the order is: Delivery of diaphragm vessels.

2. Detailed data of the subject of the contract and its scope are specified in: Appendix No. 2 to the SWZ (Form "Offer").

3. The devices being the subject of the order must be brand new, unused, i.e. manufactured not earlier than 6 months before the date of their delivery to the Ordering Party.

4. The equipment which is the subject of the contract must meet the requirements of:

- the Act of 16 April 2004 on construction products (consolidated text, Journal of Laws of 2021, item 1213, as amended) together with the implementing provisions to this Act,

- the Act of 30 August 2002 on the conformity assessment system (i.e. Journal of Laws of 2021, item 1344, as amended),

- Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 March 2011 laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC.

- Regulation of the Minister of Development of 11 July 2016 on requirements for pressure equipment and pressure equipment assemblies (Journal of Laws of 2016, item 1036) introducing Directive 2014/68/EU into Polish law (applies to Part 2) and must meet EU ecological standards set out in

announcements of the President of the Polish Committee for Standardization on the list of harmonized standards.

5. The equipment which is the subject of the contract must have:

- Current EC certificate of conformity (Declaration of Conformity) with Directive 2014/68/EU on the essential requirements for pressure equipment and pressure equipment assemblies.

6. The required minimum period of quality guarantee for the subject of the contract: 24 months from the date of their protocol receipt.

Warranty in accordance with the conditions set out in Chapters XVI and XIX of the SWZ.

7. Other conditions of the Ordering Party regarding the subject of the contract are specified in Chapter XIX of this SWZ entitled "PROVISIONS OF THE PUBLIC PROCUREMENT CONTRACT RELEVANT FOR THE PARTIES".

Download full details as .pdf
The Buyer:
Miejskie Przedsiębiorstwo Energetyki Cieplnej-Rzeszów Spółka z ograniczoną odpowiedzialnością
CPV Code(s):
39715200 - Heating equipment
44615100 - Steel pressure vessels