In connection with the sewer separation of Strøby Egede, rainwater basins have been established in Nimgårdsparken. The present contract deals with the separation of the common system in stage B, which will divert rainwater to the basin installations in Nimgårdsparken.
The construction area is Strøby Egede – stage B and is located in the eastern part of the town of Strøby Egede. The contract will take place in the roads Brinken, Pinjevej, Rønvej, Trekronervej, Akacievej and Nimgårdsvej.
The common system in Strøby Egede is to be separated and new stormwater and wastewater pipes are to be established. Some lines of the old common system will be reused for wastewater.
New wastewater connectors are expected to be established for the cadastral blocks where new main conduit is established for wastewater in road-area. In addition, new rainwater connectors must be established which will be completed inside the divides.
All connector lines, both rainwater and sewage, are established as ø160 mm PP, pipes.
Rainwater pipes will be established in dimensions from ø200 mm PP – ø1200 mm concrete.
Waste power lines are established from ø160 mm PP – ø200 mm PP.
1,500 meters rainwater pipeline and approx. 1000 meters wastewater pipeline, approx. 107 plugs for rainwater to parcels, partially converted 102 plugs for wastewater to parcels, 60 wells in dimension from ø600 – ø1500 mm.