The outdoor works for the new data center at the Helmholtz-Zentrum Dresden-Rossendorf are to be carried out.
approx. 10 running meters of asphalt cut, approx. 12m³ of asphalt demolish and disposal, approx. 20m² of paving surface, approx. 52m³ layer without binders to dispose of, approx. 60m of trench for Elt, 2 pieces of socket holes (approx. 2m x 3m), 1 piece of road crossing with 4 empty pipes DN 160, 40m³ sanding, approx. 45m trench for drainage, approx. 200m³ frost protection layer, approx. 20m drainage pipe DN 100 PP, approx. 30m drainage pipe DN 160 PP, 2 pieces height adjustment drainage shafts, 6 pieces heavy duty gutters (1m to 3.5m), 1 piece heavy duty channel 22m, approx. 30m² lawn grid area, approx. 210m² rectangular paving area, approx. 390m² asphalt base course, approx. 200m low boards, approx. 40m high boards, approx. 390m² concrete roadway, 4 pieces lighting poles, 1 piece staircase from 7 block steps, 7 pieces bicycle leaning bracket, 1500m² terrain levelling, 3000m² building ground loosen, Supply and cover 600m³ topsoil