1. The subject of the contract is: Waste collection and handling service divided into two parts
Part I: Collection and handling of waste with code ex19 12 12
Part II Description of the subject of the contract – Collection and management of waste with the code 19 12 12
Part I: Collection and handling of waste with code ex19 12 121. Collection and management of waste collected by the Contractor from the Ordering Party with code ex19 12 12 fraction above 80 mm – other waste (including mixed substances and objects) from mechanical treatment of waste other than those mentioned in 19 12 11, in the recovery process. Waste with code ex19 12 12 is prepared in the form of bales or in bulk.
2. The place of receipt of waste intended for transport and disposal is the area of the Municipal Installation, located in the Waste Segregation and Management Plant
in Wałbrzych, 43 Beethovena Street.
3. Collection of waste in adapted vehicles shall take place by transport organized by the Contractor and at its expense, also in the scope of transport costs, insurance for the time of transport and unloading. The selection of the type of transport unit for a given waste batch will be determined each time by e-mail by the representative of the Contracting entity and the representative of the Contractor.
4. The Contractor is obliged to collect approx. 50 Mg of the waste in question on working days, from Monday to Friday, from 7:00 to 14:00, on days previously indicated by the Contracting Entity, in the manner specified in accordance with point 13 of this description of the subject of the contract.
5. The Contractor undertakes to comply with the Act of 11 January 2018 on electromobility
and alternative fuels, including to ensure a combined share of at least 10% of electric vehicles or natural gas vehicles in the motor vehicle fleet
within the meaning of Article 2(33) of the Act of 20 June 1997 - Road Traffic Law used in the performance of the task, in accordance with Article 68(3) of the Act of 11 January 2018 on electromobility
and alternative fuels (Journal of Laws of 2021, item 110, as amended), taking into account possible changes to this provision, consisting in changing the required share.
6. Weighing of waste collected by the Contractor will take place on a legalized scale of the Ordering Party located on the premises of the Waste Segregation and Management Plant,
in Wałbrzych, at 43 Beethovena Street. The collected waste will be weighed on a legalized truck scale, with an accuracy of 20 kg. To determine the weight of the waste collected, the Contractor's vehicle must be weighed before loading. The above weight will be binding for settlements between the parties.
7. Weighing shall be confirmed at each time by weight.
8. The receipt of waste will take place on the basis of confirmed KPO in the BDO system for the month in which the service was performed, which is the sum of the masses indicated in weight flourishes for the month in which the service was performed.
9. Loading waste on vehicles substituted by the Contractor is the responsibility of the Ordering Party.
10. The estimated amount of waste with code ex19 12 12 to be received is:
- Approx. 6,000 Mg during the term of the contract
- approx. 50,00 Mg/day
11. The Ordering Party reserves the right to change the amount of waste. The amount of waste may be reduced by no more than 20% or increased, according to the needs of the Ordering Party. A change in the amount of waste results in a change in the final remuneration of the Contractor. Failure to perform the entire scope of the contract may not give rise to any claims on the part of the Contractor against the Contracting Entity.
12. The contractor and the waste transporter indicated by him and the takeover of this waste must be entered in the BDO (Waste Database) as part of the business, and the entry must contain the waste code in question, i.e. ex19 12 12. In accordance with the applicable regulations, the Contracting Authority issues a KPO (Waste Transfer Card) via BDO according to the data concerning the Transporter and the Waste Transferee, indicated by the Contractor on the occasion of sending by way
e-mail notification of receipt of each batch of waste.
13. Each batch of waste for collection shall be reported by the Contracting Authority to the Contractor by phone or e-mail no later than 1300 on the day preceding the collection, indicating: hours of readiness for waste collection, number of transports.
14. The Contractor shall bear the exclusive
Part II Description of the subject of the contract – Collection and management of waste with the code 19 12 121. Collection and management of waste collected by the Contractor from the Contracting entity with the code 19 12 12 (bulky waste) – other waste (including mixed substances and objects) from mechanical treatment of waste other than those listed in 19 12 11, in the recovery process. Waste with code 19 12 12 (bulky waste) prepared is in the form of "bulk" (not baled, not ground).
2. The place of receipt of waste intended for transport and disposal is the area of the Municipal Installation, located in the Waste Segregation and Management Plant
in Wałbrzych, 43 Beethovena Street.
3. Collection of waste in adapted vehicles shall take place by transport organized by the Contractor and at its expense, also in the scope of transport costs, insurance for the time of transport and unloading. The selection of the type of transport unit for a given waste batch will be determined each time by e-mail by the representative of the Contracting entity and the representative of the Contractor.
4. The Contractor is obliged to collect the waste in question on working days, from Monday to Friday, from 7:00 to 14:00, on days previously indicated by the Contracting Entity, in the manner specified in accordance with point 13 of this description of the subject of the contract.
5. The Contractor undertakes to comply with the Act of 11 January 2018 on electromobility
and alternative fuels, including to ensure a combined share of at least 10% of electric vehicles or natural gas vehicles in the motor vehicle fleet
within the meaning of Article 2(33) of the Act of 20 June 1997 - Road Traffic Law used in the performance of the task, in accordance with Article 68(3) of the Act of 11 January 2018 on electromobility
and alternative fuels (Journal of Laws of 2021, item 110, as amended), taking into account possible changes to this provision, consisting in changing the required share.
6. Weighing of waste collected by the Contractor will take place on a legalized scale of the Ordering Party located on the premises of the Waste Segregation and Management Plant,
in Wałbrzych, at 43 Beethovena Street. The collected waste will be weighed on a legalized truck scale, with an accuracy of 20 kg. To determine the weight of the waste collected, the Contractor's vehicle must be weighed before loading. The above weight will be binding for settlements between the parties.
7. Weighing shall be confirmed at each time by weight.
8. The receipt of waste will take place on the basis of confirmed KPO in the BDO system for the month in which the service was performed, which is the sum of the masses indicated in weight flourishes for the month in which the service was performed.
9. Loading waste on vehicles substituted by the Contractor is the responsibility of the Ordering Party.
10. The estimated amount of waste with code 19 12 12 to be collected shall be:
- approx. 600.00 Mg during the term of the contract
- approx. 25.00 Mg/week
11. The Ordering Party reserves the right to change the amount of waste. The amount of waste may be reduced by no more than 20% or increased, according to the needs of the Ordering Party. A change in the amount of waste results in a change in the final remuneration of the Contractor. Failure to perform the entire scope of the contract may not give rise to any claims on the part of the Contractor against the Contracting Entity.
12. The contractor and the waste transporter indicated by him and the waste taker must be entered in the BDO (Waste Database) as part of their business, and the entry must contain the waste code in question, i.e. 19 12 12. In accordance with the applicable regulations, the Contracting Authority issues a KPO (Waste Transfer Card) via BDO according to the data concerning the Transporter and the Waste Transferee, indicated by the Contractor on the occasion of sending by way
e-mail notification of receipt of each batch of waste.
13. Each batch of waste for collection shall be reported by the Contracting Authority to the Contractor by phone or e-mail no later than 1300 on the day preceding the collection, indicating: hours of readiness for waste collection, number of transports.
14. The Contractor shall be responsible for the