Landscape and traffic route construction work.
- Dispose of gravel sand 800 m³,
- Planum traffic area 1 700 m
- drainage channel 48 m,
- Asphalt base course 1 450 m
- concrete slabs passable 1 350 m
- 120 mm wall washers,
- Gabion wall 120 m
- standard trees 9 pc.,
- hedge plants 450 pieces,
- ground cover 2 100 pcs.,
- lawn 300 m
This procedure is under the allocation no. 20-97211. (Please specify when making inquiries).