In connection with the establishment of the Baltic Pipe, there is a need for upgrading safety at the existing plants. There is also a need for the safety of the newly established installations to meet the requirements made between Energinet and Gaz System. This tender deals with the establishment of security at:
- 15 existing plants
- 5 newly built plants
- Option on another 5 newly built plants.
In connection with the establishment of the Baltic Pipe, there is a need for upgrading safety at the existing plants. There is also a need for the safety of the newly established installations to meet the requirements made between Energinet and Gaz System. This tender deals with the establishment of security at:
- 15 existing plants
- 5 newly built plants
- Option on another 5 newly built plants.