- 3-storey swimming pool new building with basement, ground floor and upper floor, built into the slope
- The present course includes interior plastering work and thermal insulation composite system
(WDVS)
- 3-storey swimming pool new building with basement, ground floor and upper floor, built into the slope
- The present course includes interior plastering work and thermal insulation composite system
(WDVS)
Plaster works:
380 m2 interior plaster 2-layer lime plaster Q3
110 m2 interior plaster 2-layer lime plaster Q2
Total amount of interior plaster: 490 m2
Thermal insulation composite system:
65 m2 Ceilings ETICS Andienungshof UG, 120mm MW
90 m2 walls ETICS Andienungshof UG, 120mm MW
30 m2 walls ETICS shaft north 120mm MW
130 m2 Walls & Ceilings ETICS Shaft West 120mm MW
Total amount of ceilings and walls ETICS: 315 m2