It is a global performance market for the design, construction and maintenance of a cable link between Saint-Martin-le-Vinoux, Grenoble, Sassenage and Fontaine. The structure, about 3.6 km long, has 6 stations. The amount of the projected investment budget allocated to the project is approximately 55 000 000 EUR HT (November 2014 value). As an indication, the envisaged duration of the contract is 10 years (120 months) from the date of notification. A summary of the book can be found in the technical note (downloadable from http://agysoft.marches-publics.info).
It is a global performance market for the design, construction and maintenance of a cable link between Saint-Martin-le-Vinoux, Grenoble, Sassenage and Fontaine. The structure, about 3.6 km long, has 6 stations. The amount of the projected investment budget allocated to the project is approximately 55 000 000 EUR HT (November 2014 value). As an indication, the envisaged duration of the contract is 10 years (120 months) from the date of notification. A summary of the book can be found in the technical note (downloadable from http://agysoft.marches-publics.info).