The Hagen business enterprise (WBH) is realizing the construction of a new company building at its location. The building is erected as a reinforced concrete skeleton construction with a suspended concrete facade on well foundations. The ground floor of the new building houses a truck vehicle hall and a small workshop area. The 1st floor serves as a warehouse, but is being prepared by the expansion stand in such a way that, if required, a complete interior installation will enable office use. The 2nd and 3rd floors offer office workplaces with corresponding ancillary rooms for around 66 employees. In the attic, there is a conference room with a foyer next to the board area. A roof terrace is assigned to the foyer for meeting breaks. Access to the upper floors is realized via two stairwells with an assigned lift. A platform lift is installed in its own shaft for transporting loads to the 1st floor.
The object of the tendered works is the drywall construction work for the above-mentioned project.