Lot 1: Hardware delivery for a redundant virtualization environment with six hosts and integrated storage (80 TB net) including components for the storage network (redundant switches and necessary accessories) as well as primary and optional secondary backup servers. Lot 2: Delivery of the hardware for the operational network (redundant switches and necessary accessories).
Virtualization system incl. backup serverHardware delivery for a redundant virtualization environment with six hosts and integrated storage (80 TB net) including components for the storage network (redundant switches and necessary accessories) as well as primary and optional secondary backup servers.
Network infrastructure for the operational networkDelivery of the hardware for the operational network (redundant switches and necessary accessories).