The wood paving work is advertised at the grammar school as part of the energetic building renovation. The construction process for the wood paving work of the aula/administration takes place in the 4th BA in 3 phases.
As part of the energetic building renovation, Grammar School Stein, the wood plastering works are advertised for the 4th BA Aula/Administration in 3 phases with the following services:
Type and scope of services:
The work cannot be carried out in one step. Multiple stakes have to be expected.
Phase 1 installation of new wood paving in the section of the Aula EG;
Phase 2 installation of new wood paving in the section of the Aula EG;
Phase 3 prev. revise wooden paving in the section de Aula EC,
prev. revise wooden paving in the section of the auditorium and music EC
prev. Rework wooden paving in the 1st floor section of the hallway