Delivery, installation and commissioning of 33 telecontrol systems and reconnection of existing telecontrol technology during operation with subsequent dismantling of the old technology
The subject of this call for tender is:
Delivery, installation and commissioning of 33 telecontrol systems, pre-assembled in telecontrol cabinets. Commissioning is carried out manually as a conversion from the manufacturer's existing telecontrol technology to the new telecontrol technology during operation with subsequent data point testing. The scope of delivery also includes the connection to the provided power supply and the rerouting of the process data cables. At the end of the work, the old technology will be dismantled.
Before the start of the construction project, the contractor develops the requirements specification from the specifications and the associated attachments during the detailed planning phase. The Client guarantees the necessary support for this. After approval of the requirements specification by the client, the main order is activated and the construction release is issued.
FABRIKATSEINSCHRÄNKUNG
The aim of this project is to support the standardisation strategy:
within the swb/EWE Group. It must also be possible to provide comprehensive support from existing staff.
For these reasons, only two product families are eligible for the
Use permitted. Both product families are already available in
of the network companies and both product families can be obtained as catalog goods from any supplier from the manufacturer.
The following product families are approved for use:
Manafacture: Siemens
Typ: SICAM A 8000
Or
Hersteller: SAE IT-Systems
Type: BCU-50Die