The contracting authority intends to purchase a part of a remote solar power plant and its maintenance and maintenance services: the purchase of a power plant geographically distant from the place of electricity consumption of 115 kW (possible error of up to 1 kW), the purchase of a solar power generation plant (solar power plant or part thereof) with a capacity of 115 kW (possible error of up to 1 kW) and the service and maintenance of the specified installation.
The contracting authority intends to purchase a part of a remote solar power plant and its maintenance and maintenance services: the purchase of a power plant geographically distant from the place of electricity consumption of 115 kW (possible error of up to 1 kW), the purchase of a solar power generation plant (solar power plant or part thereof) with a capacity of 115 kW (possible error of up to 1 kW) and the service and maintenance of the specified installation.